Rental compressor - West Texas - New Mexico - Colorado - North Dakota - West Virginia - Ohio - Pennsylvania - Louisiana

Free Tool · Runtime Improvement Calculator

Every point
of runtime pays.
See how much.

Set where your fleet runs today and where it should run. See the production you’d get back, the rent you’d stop wasting and what it adds up to in a year.

BOE/d
Production back on the sales meter
Per year
Dollars from the runtime you set
Payback
Days to cover a year of Vendor Callout

Runtime Improvement Calculator

Estimates are fine. Every result updates as you type.

Your Fleet

units
%
Your best estimate if you don’t track it yet.
%
Your contract guarantee is a good place to start.
BOE/d
$ / BOE
$ / month

Moving to the target is worth

$0
a year · $0 in an average month
Today Target
Production back on the sales meter
0 BOE a year · a year
0 BOE/d
Runtime gained
0
percentage points
Down-hours avoided
0
unit-hours a year
Rent not wasted
$0
a year
Each point of runtime is worth
Vendor Callout for units
Days of the improvement that cover it
Show the mathHide the mathHow each result is worked out, step by step, from the numbers you entered.
Worth a year$31,990,365
  1. Runtime points gained98.6% − 92%6.6 points
  2. BOE/d back on the sales meter100 units × 175 BOE/d × 6.6%1,155 BOE/d
  3. BOE a year1,155 BOE/d × 365421,575 BOE
  4. Production value a year421,575 BOE × $75$31,618,125
  5. Rent not wasted a year100 units × $4,700 × 12 × 6.6%$372,240
  6. Worth a year$31,618,125 + $372,240$31,990,365
Worth in an average month$2,665,864
  1. Runtime points gained98.6% − 92%6.6 points
  2. BOE/d back on the sales meter100 units × 175 BOE/d × 6.6%1,155 BOE/d
  3. BOE a year1,155 BOE/d × 365421,575 BOE
  4. Production value a year421,575 BOE × $75$31,618,125
  5. Rent not wasted a year100 units × $4,700 × 12 × 6.6%$372,240
  6. Worth a year$31,618,125 + $372,240$31,990,365
  7. Worth in an average month$31,990,365 ÷ 12$2,665,864
Points of runtime gained6.6
  1. Runtime points gained98.6% − 92%6.6
BOE/d back on the sales meter1,155
  1. Runtime points gained98.6% − 92%6.6 points
  2. BOE/d back on the sales meter100 units × 175 BOE/d × 6.6%1,155
BOE a year421,575
  1. Runtime points gained98.6% − 92%6.6 points
  2. BOE/d back on the sales meter100 units × 175 BOE/d × 6.6%1,155 BOE/d
  3. BOE a year1,155 BOE/d × 365421,575
Production value a year$31,618,125
  1. Runtime points gained98.6% − 92%6.6 points
  2. BOE/d back on the sales meter100 units × 175 BOE/d × 6.6%1,155 BOE/d
  3. BOE a year1,155 BOE/d × 365421,575 BOE
  4. Production value a year421,575 BOE × $75$31,618,125
Rent not wasted a year$372,240
  1. Runtime points gained98.6% − 92%6.6 points
  2. Rent not wasted a year100 units × $4,700 × 12 × 6.6%$372,240
Down-hours avoided a year57,816
  1. Runtime points gained98.6% − 92%6.6 points
  2. Down-hours avoided a year100 units × 8,760 h × 6.6%57,816
Each runtime point, a year$4,847,025
  1. Each runtime point, a year100 units × (175 BOE/d × 365 × $75 + $4,700 × 12) × 1%$4,847,025
orange a number you enteredgray result of an earlier stepSteps are rounded for display; totals use the exact numbers.

Take this business case to your next vendor meeting

Get the one-page PDF report by email, with everything you entered and a link that reopens this page with your numbers filled in.

How the numbers are calculated

A year of hours (8,760) and an average month, since this looks forward.

Runtime gained

points = target runtime − runtime today

In percentage points.

Production regained

BOE/d = units × BOE/d per unit × points ÷ 100

Value = BOE × price × 365 for a year.

Rent no longer wasted

rent = units × monthly rental × 12 × points ÷ 100

Rent paid on hours a unit wasn’t compressing.

Vendor Callout comparison

units billed in steps of 5 (20 minimum) × price per unit × 12

Days to cover = annual subscription ÷ (annual gain ÷ 365).

Frequently asked questions

At least the guarantee in your rental contract, commonly 95% to 99%. Fleets that document every callout and review vendors monthly routinely run near their guarantee; the case study on this site went from 77% to 98.6% in six months.

Faster vendor response, shorter repairs and fewer repeat failures. All three improve once every outage is timestamped and reviewed with the vendor, because the slow ones become visible.

This page looks forward a whole year, so it uses a full year of hours and an average month. Credits for a specific month use that month’s calendar hours.

At the published subscription price per compressor unit, billed in steps of 5 with a 20-unit minimum, before the small per-user fee. It shows how many days of the improvement would cover a year of the subscription.

No. It is the arithmetic of the runtime you enter. Your results depend on your vendors, your iron and how consistently callouts are documented.

More free tools

See all free tools

Downtime is costing you MILLIONS!

Stop estimating. Start documenting.

Vendor Callout logs each outage from the truck, prices every down-hour and every deferred barrel as it happens, and prints the vendor report that recovers the credit.