Free Tool · Compressor Downtime Cost Calculator

Don’t Let Production Sit Idle.

What is downtime
costing you?
Run the numbers.

Enter your fleet and see what downtime costs each month: the production it held in the ground instead of the sales meter, the rental paid on units that weren’t running, and the credit your runtime guarantee says you’re owed.

Free
No sign-up, no email required
672–744 hrs
Real calendar hours, never a 730-hour average
Same Math
As the monthly vendor report

Downtime Cost Calculator

Estimates are fine. Every result updates as you type.

Your Fleet

units
Rented or owned, any make or horsepower.
$ / month
Owned units: use the rental you would pay for equivalent iron.
%
Your best estimate if you don’t track it yet.
%
Commonly written between 95% and 99%.
BOE/d
What flows across the sales meter when the unit is running.
$ / BOE
Use your strip or realized price.
Days in the month
Downtime is priced on the month’s real calendar hours, the same way your vendor report is.

Downtime is costing you

$3,187,600
per month · $38,251,200 a year at this rate
Fleet runtime 92% Guarantee 98.6%
Deferred production
42,000 BOE held in the ground, not sold this month
$3,150,000
99% of what downtime costs you · 102× the vendor credit
Rental on idle units
$37,600
5,760 unit-hours down
Credit owed, at least
$31,020
4,752 down-hours beyond the fleet’s 1,008 allowed
Owed unit by unit, so chronic units push it higher. Check each unit →
One unit down for an hour
$553
One unit down overnight (12 h)
$6,641
Each point of runtime is worth
$398,450 / mo
Show the mathHide the mathHow each result is worked out, step by step, from the numbers you entered.
Downtime cost this month$3,187,600
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. BOE deferred: still in the ground, not sold this month5,760 h × 175 BOE/d ÷ 24 h42,000 BOE
  4. Deferred production42,000 BOE × $75$3,150,000
  5. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  6. Rent paid while units sat down5,760 h × $6.5278$37,600
  7. Downtime cost this month$3,150,000 + $37,600$3,187,600
Deferred production this month$3,150,000
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. BOE deferred: still in the ground, not sold this month5,760 h × 175 BOE/d ÷ 24 h42,000 BOE
  4. Deferred production42,000 BOE × $75$3,150,000
Rent on idle units$37,600
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  4. Rent paid while units sat down5,760 h × $6.5278$37,600
Down unit-hours5,760
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760
Deferred BOE this month42,000
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. BOE deferred: still in the ground, not sold this month5,760 h × 175 BOE/d ÷ 24 h42,000
Credit owed, at least$31,020
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. Down hours the guarantee allows100 units × 720 h × (100% − 98.6%)1,008 h
  4. Down hours beyond the guarantee5,760 h − 1,008 h4,752 h
  5. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  6. Credit owed4,752 h × $6.5278$31,020
Down hours beyond the guarantee4,752
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. Down hours the guarantee allows100 units × 720 h × (100% − 98.6%)1,008 h
  4. Down hours beyond the guarantee5,760 h − 1,008 h4,752
Downtime cost a year$38,251,200
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. BOE deferred: still in the ground, not sold this month5,760 h × 175 BOE/d ÷ 24 h42,000 BOE
  4. Deferred production42,000 BOE × $75$3,150,000
  5. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  6. Rent paid while units sat down5,760 h × $6.5278$37,600
  7. Downtime cost this month$3,150,000 + $37,600$3,187,600
  8. Downtime cost a year$3,187,600 × 12$38,251,200
One unit down an hour$553
  1. Hours in the month30 days × 24 h720 h
  2. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  3. Production one unit makes in an hour175 BOE/d ÷ 24 h × $75$546.88
  4. One unit down an hour$6.5278 + $546.88$553
One unit down overnight (12 h)$6,641
  1. Hours in the month30 days × 24 h720 h
  2. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  3. Production one unit makes in an hour175 BOE/d ÷ 24 h × $75$546.88
  4. One unit down an hour$6.5278 + $546.88$553.40
  5. One unit down overnight$553.40 × 12 h$6,641
Each runtime point, a month$398,450
  1. Hours in the month30 days × 24 h720 h
  2. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  3. Production one unit makes in an hour175 BOE/d ÷ 24 h × $75$546.88
  4. One unit down an hour$6.5278 + $546.88$553.40
  5. Each runtime point, a month100 units × 720 h × 1% × $553.40$398,450
Deferred production ÷ credit102×
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. BOE deferred: still in the ground, not sold this month5,760 h × 175 BOE/d ÷ 24 h42,000 BOE
  4. Deferred production42,000 BOE × $75$3,150,000
  5. Down hours the guarantee allows100 units × 720 h × (100% − 98.6%)1,008 h
  6. Down hours beyond the guarantee5,760 h − 1,008 h4,752 h
  7. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  8. Credit owed4,752 h × $6.5278$31,020
  9. Deferred production ÷ credit$3,150,000 ÷ $31,020102×
Production share of the cost99%
  1. Hours in the month30 days × 24 h720 h
  2. Down unit-hours100 units × 720 h × (100% − 92%)5,760 h
  3. BOE deferred: still in the ground, not sold this month5,760 h × 175 BOE/d ÷ 24 h42,000 BOE
  4. Deferred production42,000 BOE × $75$3,150,000
  5. Rent per unit, per hour$4,700 ÷ 720 h$6.5278
  6. Rent paid while units sat down5,760 h × $6.5278$37,600
  7. Downtime cost this month$3,150,000 + $37,600$3,187,600
  8. Production share of the cost$3,150,000 ÷ $3,187,60099%
orange a number you enteredgray result of an earlier stepSteps are rounded for display; totals use the exact numbers.

Take these numbers to your next vendor meeting

Get the one-page PDF estimate by email, with everything you entered and a link that reopens this page with your numbers filled in.

How the numbers are calculated

Every figure uses the same math Vendor Callout prints on a monthly vendor report, so a number from this page holds up when someone checks it line by line.

Down unit-hours

units × hours in the month × (1 − runtime %)

Hours in the month are 672, 696, 720 or 744, not a 730-hour average.

Deferred production value

down hours × (BOE/d per unit ÷ 24) × price per BOE

Gross value before LOE, taxes and royalties: revenue the month didn’t book. Usually the largest number on the page by far.

Rental paid on idle units

down hours × (monthly rental ÷ hours in the month)

The rent you paid on iron that wasn’t compressing.

Credit owed under the runtime guarantee

allowed hours = (100% − guarantee) × hours in the month × units
credit = max(0, down hours − allowed hours) × hourly rental

Contracts credit each unit separately, month by month. This page uses a fleet average, so if a few chronic units carry most of your downtime, the real credit is higher than shown.

Frequently asked questions

Yes, and it is the headline. Every result shows the barrels of oil equivalent that stayed in the ground instead of crossing the sales meter this month, and what they were worth, next to the rental and the credit. In Vendor Callout, every callout carries its own deferred-production figure from that unit’s production rate, so you watch it accrue on the dashboard and see it on the monthly report.

A compressor that is down leaves the oil and gas in the reservoir; they are produced later, so the revenue comes late rather than never. Late revenue is worth less, and some volumes can be lost for good (gas flared or vented in an upset, or production a declining well never makes up), but most of it is deferred. Many operators still call it lost production; the arithmetic is the same.

The credit is capped by the rental: at most, it returns the rent for the hours beyond what the contract allows. Deferred production is the oil and gas the unit should have moved to the sales meter. In the default example, one unit down for an hour defers about $547 of production against about $6 of rental. The credit pays for the documentation; the runtime pays for everything else.

Use your best estimate, then check it. Without a timestamp on every callout, vendor arrival and return to service, runtime is a guess, and so are the deferred production and the credit.

Yes. Convert at 6 Mcf per BOE, or enter Mcf/d per unit with a price per Mcf. The math is the same. Vendor Callout itself tracks wet-gas fleets in Mcf/d and condensate yield.

Use the fleet average: total production that moves through compression divided by the number of units. For a sharper number, run the calculator once per route or field and add the results.

It is what one percentage point of fleet runtime is worth per month in production and rental combined. It is the clearest way to size a goal: moving from 92% to 95% is worth three of those points every month.

Rarely. Credits are paid on documented downtime that is presented to the vendor. If it isn’t documented, it’s a free outage.

Only if you ask us to email it. Every number is calculated in your browser. If you use Email Me This Report, we receive your email address, what you entered and the figures in the report so we can send it to you; nothing else you type reaches our servers.

More free tools

See all free tools

Downtime is costing you MILLIONS!

Stop estimating. Start documenting.

Vendor Callout logs each outage from the truck, prices every down-hour as it happens, and prints the vendor report that recovers the credit.